Work to complete the interior included:

  • Installing power and lighting circuits running to a small fusebox fitted inside
  • Fitting switched power sockets, light switches, interior and exterior lights
  • Fitting insulation between the studs and rafters
  • Fixing taper-edged plasterboard to the walls and ceilings and finishing joints using tape and plaster mix
  • Laying laminate flooring
  • Installing skirting boards and architraves

Here is the completed project in August 2015: